Lexington City Schools - New Charles England Intermediate School
Lexington, NC
        RBSA has a long-standing relationship with Lexington City Schools, providing both minor and major architectural
        services as needs arise. After performing small renovation projects on the former Charles England Intermediate
        Campus in 2002 and 2004, the system decided to build a new facility. This new facility is based on Elizabeth
        Hanford Dole Elementary School which we designed and delivered to Rowan Salisbury Schools. 
        This H-plan prototype provides clear circulation, grouping of activities to minimize construction costs and
        provide public access to after-hour uses while limiting access to classrooms. Access platforms run continuously
        above the corridors to allow maintenance staff the ability to service mechanical equipment without disturbing
        school functions. These platforms serve a dual role as safety escape corridors in event of emergency.
      
Client:
Lexington City Schools
Size:
83,639 sq. ft. New Construction